Pipe diameter of 72” that was pushed into the harbour with Permalock fittings. After the installation of the pipe all the joints needed welding and coatings. This was challenging as the pipe was under water.
Pipe diameter of 72” that was pushed into the harbour with Permalock fittings. After the installation of the pipe all the joints needed welding and coatings. This was challenging as the pipe was under water.