May 2014 to Aug 2015. Cost of scope $1.2 million. 80” 4.6km penstock near North end of Harrison Lake. Challenging, mountainous terrain. Some of this line was built on a 50% slope down to the powerhouse.
May 2014 to Aug 2015. Cost of scope $1.2 million. 80” 4.6km penstock near North end of Harrison Lake. Challenging, mountainous terrain. Some of this line was built on a 50% slope down to the powerhouse.