Jewel installed 1.86 km of 7 foot diameter pipe line running along Capilano road in North Vancouver. The pipeline installation stretched from the Capilano water shed to Edgemont Blvd , where it ends with two chambers. The Cap 9 project had various challenges which included a compressed delivery schedule and complex pipe fabrication requirements.
Project highlights include:
- 12” flow meter chamber
- 60” line valve Chamber
- 60” crossover chamber tying in Cap 9 to other pipe lines feeding water to Metro Vancouver (Cap 4, Cap 5, Cap 6, and Cap 7)
- Numerous air valve and blow down chambers
- Mechanical installations of the chambers