June 2007 to Dec 2011. Total cost of scope for all phases in five contracts $4.5 million. Total of approximately 10km long of 72” diameter pipeline including 9-line valve chambers, 2 cross over chambers, all the control valve piping as well as all the tie in work for Metro Vancouver.